国语对白做受xxxxx在线_亚洲精品久久久久久久久久吃药_亚洲暴爽av天天爽日日碰_奇米影视7777久久精品人人爽_少妇高潮毛片免费看

The first announcement on environmental impact assessment of energy conservation and environmental protection comprehensive upgrading project

Column:Corporate News Time:2016-07-14 Browsing volume: 500

Energy saving and environmental protection comprehensive upgrading project of Shandong Dongjia Group Co., Ltd

The first announcement of environmental impact assessment

According to the requirements of the Interim Measures for Public Participation in Environmental Impact Assessment (HF [2006] No. 28) and the Notice on Strengthening the Supervision and Management of Public Participation in Environmental Impact Assessment of Construction Projects (LHPH [2012] No. 138), the following announcements are hereby issued:

1、 Name and outline of the construction project:

Project name: Energy saving and environmental protection comprehensive upgrading project

Employer: Shandong Dongjia Group Co., Ltd

Construction site: Shandong Dongjia Group Co., Ltd., No. 55, Qiugu Hengli River, Boshan District, Zibo City

Main construction contents:

The project is an energy conservation and environmental protection upgrading project. The main construction content is to upgrade the washing process in the water washing section from plate and frame washing to membrane washing, so as to save primary water consumption and reduce wastewater discharge; Dismantle 1 # and 2 # old calcining kilns, 3 # as a test kiln, replace it with a 4-meter diameter energy-saving and environment-friendly calcining kiln, and provide efficient venturi, water scrubbing tower, electric demister, and alkali scrubbing tower environmental protection facilities. Dismantle the original 35m chimney, build a new 60m kiln chimney, reduce the emission of waste gas pollutants, and achieve environmental upgrading; Replace the double effect concentration system in the concentration process, the filter press in the salt treatment process, and the large high-efficiency flash evaporation equipment in the drying process to reduce the steam consumption and achieve energy saving upgrading; The hydrolysis process is upgraded to adding crystal seeds, the bleaching process is replaced by a large bleaching tank, the crushing process is replaced by an imported Raymond mill, the wet grinding process is replaced by an efficient sand mill, and the chemical treatment process is upgraded to a new coating process. With the same capacity, the product quality is upgraded and the product structure is optimized.

The project belongs to the encouraged category in the Guiding Catalogue of Industrial Restructuring (2011 Edition) (Revised), which conforms to the national industrial policy.

2、 Name and contact information of the construction unit

Employer: Shandong Dongjia Group Co., Ltd

Address: Shandong Dongjia Group Co., Ltd., No. 55, Qiugu Hengli River, Boshan District, Zibo City

Contact: Manager Sun Tel: 0533-4167711 Postal code: 255200

3、 Introduction to the evaluation organization undertaking the environmental impact assessment

Environmental impact assessment unit: Shandong Haimeinong Project Consulting Co., Ltd

Certificate No.: GHPZ No. 2452; Industry scope: light industry, textile, chemical fiber, chemical, petrochemical and pharmaceutical industry, metallurgy, electromechanical industry, building materials, thermal power, social areas, general project environmental impact report, special project environmental impact report, etc.

Address: Fengrun Building, No. 100, South Industrial Road, Jinan Post code: 250100

Contact: Manager Han Tel.: 0531-81795815 Fax: 0531-81795818 ext. 8100

4、 Working procedures and main work contents of environmental impact assessment

(1) The environmental impact assessment process of the Project is as follows, and the flow chart is shown in Figure 1:

① According to the national "Directory of Classified Management of Environmental Protection of Construction Projects", it is determined that the project should prepare an environmental impact report.

② Study the national and local laws, regulations and standard documents related to environmental protection, and study the technical documents and other documents related to the construction project; Conduct preliminary environmental survey and preliminary engineering analysis.

③ Identify environmental impact factors and screen assessment factors to determine the assessment priorities.

④ The work grade of each individual environmental impact assessment is determined on the basis of environmental status survey and preliminary engineering analysis of the Project.

⑤ Use the current monitoring data to analyze the impact of the whole plant on the environment.

⑥ Evaluate the environmental impact of the construction project according to national and local laws, regulations and standards.

⑦ On the basis of public participation in the survey, the evaluation conclusion on the environmental feasibility of the construction project is given; Put forward environmental protection measures and suggestions and complete the preparation of the report.

(2) Main contents of EIA:

① Engineering analysis.

② Investigation and assessment of environmental status.

③ Identification of environmental impact, screening of assessment factors and determination of assessment grade.

④ Environmental impact analysis, prediction and assessment.

⑤ Environmental protection measures and their technical and economic demonstration.

⑥ Analyze the economic profit and loss of the environmental protection measures of the proposed project.

⑦ Conduct public participation survey.

⑧ Prepare environmental monitoring and management plan.

⑨ From the perspective of environmental protection, give the exact conclusion whether the project can continue to be constructed and operated.

5、 Main issues for public comments

We hope to get your attitude towards the project construction, your views on the positive and negative impacts of the construction project, your most concerned issues, your wishes and requirements, etc.

6、 Main ways of public opinions

If the public has any opinion on the environmental protection of the construction project, they can submit it to Shandong Dongjia Group Co., Ltd. or Shandong Haimeinong Project Consulting Co., Ltd. within 10 working days from the date of this announcement. The feedback method can be telephone, fax or e-mail.

Shandong Dongjia Group Co., Ltd

July 14, 2016


中国亚州女人69内射少妇| 中文字幕在线亚洲综合| 亚洲人成人一区二区三区| 7777色鬼xxxx欧美色妇| 亚洲自偷自偷在线成人网站传媒| 色爱情人网站| 女人高潮喷水毛片免费| 国产成人在线午夜视频| 久久国产精品77777| 最近最新中文字幕| 在线播放免费av大片| 美女视频黄频a美女大全| 日本三级在线播放线观看免| 男女一边摸一边做爽爽| 久久久久成人精品无码中文字幕 | 亚洲ⅴ国产v天堂a无码二区| 日韩免费视频| 高清视频在线观看一区二区三区| 国产精品日韩欧美一区二区三区| 97免费人妻无码视频| 久久久久久久99精品国产片| 国产毛片久久久久久国产毛片| 欧美乱大交xxxxx潮喷| 亚洲成a人v欧美综合天堂麻豆| 日本a级视频在线播放| 久久99国产精品一区| 亚洲精品无码鲁网中文电影| 免费永久在线观看黄网站| 天堂…中文在线最新版在线| 国产精品欧美久久久久无广告| 国产一码二码三码区别| 欧美两根一起进3p做受视频| 日本一道综合久久aⅴ免费| 18无码粉嫩小泬无套在线观看| 精品无码一区二区三区在线| 亚洲欧美中文字幕5发布| 成人国产在线永久免费| 久久电影网午夜鲁丝片免费| 亚洲av无码精品蜜桃| 精品国产一区二区三区av片 | 男女裸交无遮挡啪啪激情试看|